2,774 sites · data from Compute Atlas (CC BY 4.0) + 1,017 unverified from outside research · synced Oct 10, 2026
2,774
55 states & territories · 783 operators
550 GW
From 1,850 sites (67%)
78.1 GW
472 GW more under construction or planned
$1,572.7B
Across 370 sites that report it
2,283
546 with OSM footprints · 369 multi-building campuses
Build-out pipeline
Projects not yet running add 472 GW, 6.0× the 78.1 GW already operating.
- Operational
- 78.1 GW
- 14% of capacity · 1,365 sites
- Under construction
- 125 GW
- 23% of capacity · 246 sites
- Permitted
- 33.8 GW
- 6.1% of capacity · 129 sites
- Proposed
- 185 GW
- 34% of capacity · 481 sites
- Planned, stage unreported
- 128 GW
- 23% of capacity · 553 sites
Capacity is the largest figure each source reports: planned build-out or operating IT load. 924 sites don't disclose one.
Growth
Announcements by year
When projects were first announced, colored by where they stand today.
Announcement dates exist for 519 of 1,757 Compute Atlas records; outside research carries none. * 2026 is year to date.
Project size
Sites by disclosed capacity. 148 gigawatt-scale projects hold 62% of the capacity still to come.
- Under 10 MW3041.2 GW
- 10–50 MW41111.8 GW
- 50–100 MW38025.9 GW
- 100–300 MW30754.6 GW
- 300 MW–1 GW286146 GW
- 1–5 GW154249 GW
- 5 GW+861.9 GW
924 sites don't disclose capacity.
Geography & operators
Top states
Where capacity and sites concentrate. Names open the state on the map.
Top 12 of 55 states and territories.
Top metro areas
Census metropolitan areas, which span state lines. Names open the metro on the map.
- 1Washington–Arlington–AlexandriaDC-VA-MD-WV35.6 GW429 sites
- 217.8 GW101 sites
- 316 GW89 sites
- 413.4 GW97 sites
- 5ColumbusOH12 GW60 sites
- 611.8 GW106 sites
- 7RenoNV11.6 GW32 sites
- 810.6 GW31 sites
- 910.4 GW16 sites
- 10RichmondVA9 GW40 sites
- 118.7 GW24 sites
- 12AmarilloTX6.9 GW3 sites
Top 12 of 243 metro areas. Sites are placed by their coordinates (2023 OMB definitions). 400 sites outside any metro area are left out.
Top operators
Largest developers and operators. Names open their sites on the map.
- 1AmazonIncludes 5 other filing names58.9 GW264 sites
- 2GoogleIncludes 2 other filing names25.2 GW74 sites
- 3MicrosoftIncludes 1 other filing name21.5 GW186 sites
- 419.5 GW19 sites
- 516.5 GW2 sites
- 6MetaIncludes 1 other filing name16.1 GW38 sites
- 714.7 GW2 sites
- 8QTS Data CentersIncludes 2 other filing names12.6 GW59 sites
- 9PowerHouse Data CentersIncludes 2 other filing names12.4 GW18 sites
- 1010.2 GW48 sites
- 1110.1 GW2 sites
- 12OpenAIIncludes 5 other filing names9.5 GW6 sites
Top 12 of 783 operators. Filing-name variants are merged (Amazon Web Services counts as Amazon). 39 sites with an undisclosed operator are left out.
Power & cooling
Energy source
Primary power supply, with disclosed capacity.
- Grid35366% · 126 GW
- Mixed6312% · 67.3 GW
- On-site gas5410% · 63.5 GW
- Solar315.8% · 9.3 GW
- Hydro183.4% · 2.1 GW
- Wind71.3% · 1.8 GW
- Other61.1% · 991 MW
- Nuclear2<1% · 1.6 GW
Reported for 534 of 1,757 Compute Atlas records.
Utilities
Utilities serving the most tracked sites.
- Dominion Energy Virginia569% · 8 GW
- ComEd264.2% · 7.6 GW
- Silicon Valley Power233.7% · 577 MW
- NV Energy203.2% · 3.7 GW
- Georgia Power193% · 8.7 GW
- Xcel Energy142.2% · 1.2 GW
- Portland General Electric (PGE)142.2% · 934 MW
- PacifiCorp132.1% · 18.2 GW
- Pacific Gas & Electric (PG&E)132.1% · 1.2 GW
- Rappahannock Electric Co-op111.8% · 3.6 GW
Top 10 of 208 utilities, reported for 623 of 1,757 Compute Atlas records.
Cooling
Cooling design, which drives water use.
- Closed loop33663% · 111 GW
- Air-cooled7213% · 25.7 GW
- Unknown468.6% · 23.2 GW
- Evaporative458.4% · 13.5 GW
- Hybrid356.6% · 9.4 GW
Reported for 534 of 1,757 Compute Atlas records.
Communities & AI
Local reaction
How nearby communities have responded, from support to lawsuits.
- Locally supported6914% · 35.5 GW
- Mixed local reaction11023% · 72.7 GW
- Contested locally19440% · 96.7 GW
- Local opposition6714% · 15.8 GW
- In litigation479.7% · 30.5 GW
Reported for 487 of 1,757 Compute Atlas records.
AI workloads
Sites identified as built for AI training or inference.
- Likely AI23147% · 101 GW
- AI campus17736% · 131 GW
- AI / mixed use8016% · 16.5 GW
Classified for 488 of 1,757 Compute Atlas records.
Largest projects facing pushback
Biggest disclosed projects that are contested, opposed or in litigation.
| # | Project | Status | Capacity | Local reaction |
|---|---|---|---|---|
| 1 | Stratos AI Data Center CampusO'Leary Digital · Lucin, UTProposedContested locally | Proposed | 9 GW | Contested locally |
| 2 | Project Matador (Fermi Project Matador)Fermi America · Amarillo, TXUnder constructionContested locally | Under construction | 5.8 GW | Contested locally |
| 3 | PowerHouse Caldwell County Data CenterPowerHouse Data Centers · Uhland, TXProposedContested locally | Proposed | 4 GW | Contested locally |
| 4 | Project Merlin (Helios II)Galaxy Digital · McGregor, TXProposedContested locally | Proposed | 3.5 GW | Contested locally |
| 5 | Project Camellia (OpenAI Effingham County Campus)OpenAI · Rincon, GAProposedIn litigation | Proposed | 3.2 GW | In litigation |
| 6 | TECfusions Keystone ConnectTECfusions · Upper Burrell Township, PAProposedIn litigation | Proposed | 3 GW | In litigation |
| 7 | AWS Hobart CampusAmazon Web Services · Hobart, INUnder constructionContested locally | Under construction | 2.4 GW | Contested locally |
| 8 | Amazon Project RainierAmazon Web Services · New Carlisle, INOperationalContested locally | Operational | 2.2 GW | Contested locally |
Public incentives
Kinds of incentive
177 sites report 222 tax breaks and grants; 64 carry a dollar value, totaling $8.3B.
- Sales & use tax exemptions8749% · $2.9B
- Property tax breaks9755% · $5.7B
- Income & jobs tax credits1911% · $32M
- Grants & public funding1911% · $438M
- Other or unspecified84.5% · $372M
A site or package can count under several kinds, so shares and values overlap.
Incentives by state
Sites with incentives, and the disclosed value.
- Illinois2615% · $496M
- Ohio2011% · $127M
- Texas137.3% · $147M
- Indiana105.6%
- Georgia84.5% · $75M
- Louisiana74%
- Wyoming74%
- Iowa63.4% · $391M
- Utah63.4%
- Oregon63.4%
Top 10 of 36 states.
Largest disclosed incentives
Sites with the highest reported incentive value. Names open the site on the map.
| # | Project | Status | Capacity | Incentives |
|---|---|---|---|---|
| 1 | Nebius Birmingham AI Factory (BHM01) (Nebius Birmingham Data Center)Nebius Group · Birmingham, ALUnder construction$3.2B in incentives | Under construction | 300 MW | $3.2B |
| 2 | STREAM U.S. Data Centers at STAMPStream U.S. Data Centers LLC · Alabama, NYProposed$1.7B in incentives | Proposed | 500 MW | $1.7B |
| 3 | H5 Data Centers Buffalo I (formerly Yahoo Lockport) (H5 Data Centers Buffalo Campus)H5 Data Centers · Lockport, NYOperational$478M in incentives | Operational | 15 MW | $478M |
| 4 | Stargate Lighthouse CampusVantage Data Centers · Port Washington, WIUnder construction$458M in incentives | Under construction | 902 MW | $458M |
| 5 | Applied Digital Delta Forge 2 (Brookwood AI Factory Campus)Applied Digital · Brookwood, ALProposed$315M in incentives | Proposed | 210 MW | $315M |
| 6 | Project CannoliGoogle · Van Buren Township, MIProposed$250M in incentives | Proposed | 1 GW | $250M |
| 7 | Apple Waukee Data CenterApple · Waukee, IAOperational$208M in incentives | Operational | — | $208M |
| 8 | Meta Davenport Data CenterMeta · Davenport, IAProposed$161M in incentives | Proposed | — | $161M |
| 9 | Meta Fort Worth Data CenterMeta · Fort Worth, TXOperational$147M in incentives | Operational | 249 MW | $147M |
| 10 | 5C Group / Vultr Data Center (Prime Ohio)5C Group (Hypertec Cloud + 5C Data Centers); tenant Vultr (The Constant Company, LLC) · Springfield, OHUnder construction$127M in incentives | Under construction | 150 MW | $127M |
Values are as reported, usually taxes forgone over the full term, and exist for 64 of 222 incentives. Recorded for 177 of 1,757 Compute Atlas records.
Projects
Largest projects
The ten biggest by disclosed capacity. Names open the site on the map.
| # | Project | Status | Capacity | Investment |
|---|---|---|---|---|
| 1 | Creekstone Energy Delta GigasiteCreekstone Energy · Delta, UTUnder construction$17B | Under construction | 10 GW | $17B |
| 2 | PORTS-Pike Technology CampusSB Energy · Piketon, OHUnder construction | Under construction | 10 GW | — |
| 3 | Stratos AI Data Center CampusO'Leary Digital · Lucin, UTProposed | Proposed | 9 GW | — |
| 4 | GW RanchPacifico Energy · TXProposed | Proposed | 7.7 GW | — |
| 5 | Wonder Valley UtahO'Leary Digital · UTPlanned | Planned | 7.5 GW | — |
| 6 | Lea County Data CenterNew Era Energy & Digital, Inc. · Lovington, NMProposed | Proposed | 7 GW | — |
| 7 | Project Matador (Fermi Project Matador)Fermi America · Amarillo, TXUnder construction | Under construction | 5.8 GW | — |
| 8 | Data City, TexasEnergy Abundance Development Corporation · Laredo, TXProposed | Proposed | 5 GW | — |
| 9 | Delta Gigasite - ExpansionCreekstone Energy · UTPlanned | Planned | 4.7 GW | — |
| 10 | Homer City Energy CampusHomer City Redevelopment · Homer City, PAUnder construction$10B | Under construction | 4.5 GW | $10B |
Data quality
Record confidence
How well each site's existence and status are corroborated.
- Confirmed70125% · 160 GW
- Reported2,05374% · 371 GW
- Rumored20<1% · 19 GW
Location evidence
What pins each site to the map, strongest evidence first.
- Building footprints (OpenStreetMap)31511% · 20 GW
- Facility point (OpenStreetMap)361.3% · 609 MW
- Site outline (OpenStreetMap)10<1% · 915 MW
- Official site address (curated)1<1%
- Street address (US Census geocoder)39114% · 12.3 GW
- As reported69325% · 188 GW
- Outside research (unverified)1,32848% · 328 GW
Outside research positions are unverified and shown faded on the map.